发布开云手机在线登陆入口-开云(中国):2021-06-10
Time | University | Specialty | Degree |
---|---|---|---|
2003-2005 | University of Reading(UK) | Construction Management | Ph.D |
1996-1999 | Tianjin University | Management Science and Engineering | Master |
1992-1996 | Tianjin University | Infrastructure Project Management | Bachelor |
Time | Company | Position |
---|---|---|
2007-Now | College of Management and Economics, Tianjin University | Associate Professor |
2006-2010 | Department of Construction Management, School of Management, Tianjin University | Assistant to the Chair |
2001-2007 | School of Management,Tianjin University | Lecturer |
1999-2001 | School of Management, Tianjin University | Assistant Lecturer |
[1] Chen, Y. Q., Zhang, Y. B., Liu, J. Y. (corresponding author) and Mo, P. (2012) Interrelationships among critical success factors of construction projects based on structural equation model. Journal of Management in Engineering, 28(3): 243-251. (SCI, EI)
[2] Chen, Y.Q., Liu, J.Y. (corresponding author), Li, B.G. and Lin B.S. Project delivery system selection of construction projects in China using Artificial Neutral Network and Data Envelopment Analysis [J]. Expert Systems with Applications, 2011, 38(5): 5456–5462. (SCI, EI)
[3] Liu, J.Y. and Low, S.P. Work-family conflicts experienced by project managers in the Chinese construction industry [J]. International Journal of Project Management, 2011, 29(2): 117–128. (SSCI)
[4] Low, S. P., Liu, J. Y. (corresponding author) and Kumaraswamy, M. (2010) Institutional Compliance Framework and Business Continuity Management in Mainland China, Hong Kong SAR and Singapore[J]. Disaster Planning and Management, 19(5): 596-614. (SSCI)
[5] Liu, J. Y., Low, S. P. and He, X. (2010) Theory and practice of establishing an enterprise risk management framework in construction firms. International Economic Cooperation, 3:9-12 (in Chinese). (CSSCI)
[6] Liu, J. Y. and Low, S. P. (2009) Developing an organizational learning-based model for risk management in Chinese construction firms: a research agenda[J]. Disaster Prevention and Management, 18(2):170-186. (SSCI)
[7] Low, S. P., Liu, J. Y. and He, S. (2009) External risk management practices of Chinese construction firms in Singapore[J]. KSCE Journal of Civil Engineering, 13(2):85-95.
[8] Liu, J. Y. and Low, S. P. (2007) Enhancing buildability in China’s construction industry using Singapore’s Buildable Design Appraisal System[J]. Journal of Technology Management in China, 2(3):264-278.
[9] Liu, J. Y., Low, S. P. and Ge, R. (2007) Application of An Organizational Learning Model for Developing Risk Management in Construction Enterprises. Journal of Tianjin University (Social science), 9(6) 517-520 (in Chinese). (CSCD)
[10] Liu, J. Y., Li, B. G., Lin, B. S. and Nguyen, V. (2007) Key issues and challenges of risk management and insurance in China’s construction industry: an empirical study[J]. Journal of Industrial Management and Data Systems, 107(3):382-396.(SCI, EI)
[11] Liu, J. Y., Flanagan, R. and Jewell, C. (2006) The transfer of construction risks in China - an insurance industry perspective[C]. Proceedings of the 13th International Conference on Industrial Engineering and Engineering Management & the 1st International Conference on Asian Industrial Engineering and Management, Qingdao. August: 7.(ISTP)
[12] Wang, X., Shao, H. and Liu, J. Y. (2000) How to Avoid the Foreign Currency Risk of corporations in International Financing. China Soft Science, 3:87-88 (in Chinese).
[13] Wang, X., Liu, J. and Zeng, Z. (1999) Risk appraisal on Corporations Annex. China Soft Science, 9:100-101 (in Chinese).
[1] Supervision for a Best Undergraduate Thesis Award in 2010
[2] Excellent Teacher Award, School of Management, Tianjin University, in 2008
[3] Supervision for a Best Undergraduate Thesis Award in 2007
[1] Translating into Chinese: Loosemore, M, Raftery J, Reilly, C and Higgon D (2005) “Risk management in projects, Second Edition”, China Architecture and Building Press, 2011.
[1] The Optimal Model for the Decision-making of Risk Management Input in International Projects, Natural Science Foundation of China (71202084), 2013-2015
[2] A study of discussion didactics based on mind mapping, Tianjin Education Research Project, 2012-2013
[3] Internationalization of education for graduate students facing the teaching process, Training Program for Innovative Graduate Students, Tianjin University, 2012-2013
[4] Establishment of e-Learning Platform for Risk Management Course, Training Program for Innovative Graduate Students, Tianjin University, 2011-2012
[5] Situational Education of Engineering Risk Management from a Life-Cycle Perspective, Education Reform Projects for Undergraduate Students, Tianjin University, 2011-2012
[6] The Mechanism of Enterprise Risk Management Influencing Enterprise Performance: Empirical Study of Chinese and Singaporean Construction Enterprises, Innovation Foundation of Tianjin University, 2010-2011
[7] An organizational learning-based model for developing risk management in construction enterprises, The Project Sponsored by the Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry, 2007-2009
[1] Optimization of Insurance Management of EPC Pipeline Engineering Projects, Hebei Oil Vocational and Technical College, 2011-2012
[2] Standard Procedure for International Construction Projects, China Railway Construction Corporation (Hong Kong), 2008-2009
[1] Member of CIOB North China Management Committee
[2] Board member of the committee of the Journal of International Economic Cooperation
[1] Member of the Chartered Institute of Building
[2] Special Issue Guest Editor of the journal of Engineering, Construction and Architectural Management
[3] Membership of the Editorial/Advisory Board of the journal The Business Review
[4] Referee of journals, such as, Journal of Construction Management and Economics , Journal of Technology Management in China, China Civil Engineering Journal, Journal of Quantity Surveying & Construction, Journal of International Economic Cooperation, etc.