Faculty Research

ZHANG Lianying

发布开云手机在线登陆入口-开云(中国):2021-06-10

Biography

【Education and Working Experience】

Time University Specialty Degree Position
1995-1999 Tianjin University Structural engineering Ph.D
1992-1995 Tianjin University Offshore engineering Master
Jun. 2005-Now College of Management and Economics, Tianjin University Professor
Nov. 1999-Jun. 2005 School of management, Tianjin University Associate Professor
Jul. 1994-Nov. 1999 School of management, Tianjin University Lecture
Jan. 1990-Jul. 1994 School of architecture engineering,         Tianjin University Assistant
Publications

【Monographs and Textbooks】

[1] Lianying Zhang General Editor,Project Mnagement,Higher Education Press, Beijing: 2012.06

[2] Lianying Zhang General Editor, Equipment Engineering Supervision and methods, Beijing: China Personnel Press, 2010.3.

[3] Lianying Zhang General Editor, Introduction to Project Management, Beijing: Tsinghua University Press, 2008.10

[4] Lianying Zhang General Editor, Occupational health and safety and environmental management, Tianjin: Tianjin University Press, 2006.12

【Representative Academic papers】

[1] Zhang Lianying, He Jing, Zhang Xinxing. The Project Management Maturity Model and Application Based on PRINCE2. Procedia Engineering, 2012,Vol.29, 3691-3697.

[2] Lianying Zhang, Qiong Wu, Chen Chen, Yan Yue. Solution foe the Nonlinear Multi-Objective Model in Construction Projects Using Improved Particle Swarm Optimization. Research Journal of Applied Sciences, Engineering and Technology,2012,4(19):3565-3573.

[3] Lianying Zhang,Yuan Gao. Safety Culture and Influencing Factors Analysis in Construction Enterprises of China. Research Journal of Applied Sciences, Engineering and Technology,2012, 4(18):3297-3312.

[4] Sun Yanfang, Zhang Lianying. Determination of Social Discount Rate of Investment in Public Projects Based on the Concept of Sustainable Development,2012(3),No.147.

[5] Lianying Zhang, Yan Luan, Xuqing Zou. Time-cost-quality Trade-off Optimization Model of Construction Project. Systems Engineering,2012.3,Vol.30.No.3.

[6] Sun Yanfang, Zhang Lianying, Han Haifeng, Research on Account Problem of Government Guaranty in Public-private Partnership of Public Projects. Theory and Practice of Finance and Economics,2011,Vol.32,No.172,62-66.

[7] Zhang Lianying, Zhao Xu. IPD Model of Project and Application Obstacles. Project Management Technology. 2011,Vol.9,No.1,13-17.

[8] Chen Yongqiang, Gao Ming, Zhang Lianying. Tradeoff Model of Duration-cost-quality Based on Genetic Algorithms and Pareto Ranking. System Engineering Theory and Practice. 2010,Vol.30,No.10,1774-1780.

[9] Liu Xiaofeng, Chen Tong, Zhang Lianying. Research on Best Securities

Portfolio Based on Particle Swarm Algorithm. Journal of System Management.

2008,Vol.17,No.2,221-224,234.

[10] Zhang Lianying, Construction of Corporate Social Responsibility Management System in China’s Construction Industry .Journal of Tianjin University(SocialSciences). 2007.9Vol,No.5,416-419.

[11] Lianying Zhang, Zhengpeng Wang. The development of the partnership model as

well as the revelation of the construction industry in China. China Engineering

Science. 2006.8,Vol.8,No.8,7-11.

[12] Zhang Lianying, Sun Chunfeng. Study on the Computer-aided Drawing Algorithm for Fault Tree Graph. Industrial Engineering Journal,2006.11,Vol9, No.6

[13] Xiaofeng Liu, Tong Chen, Lianying Zhang. Integrated Optimization of Quality, Cost and Duration of the Project Based on Particle Swarm Optimization. Civil Engineering Journal. 2006,Vol.39,No.10,122-126.

[14] Zhang Lianying, Chen Songyin. The Study of Resource Equilibrium Based on Particle Swarm Optimization. Industrial Engineering Journal,2006.9,Vol9.No.5.

[15] Zhang Lianying. Analysis of the Diversity of Population and Convergence of Genetic Algorithms based on Negentropy. Systems Engineering and Electronics Technology (English ), 2005,Vol. 16,No.1,215-219.

[16] Zhang Lianying. System Reliability Optimization Based on Particle Swarm Optimization. Industrial Engineering Journal,2004,Vol.7,No.5.

[17] Zhang Lianying, Zhang Jinping, Wang Liang. Genetic Algorithms Based on MATLAB of Construction Project Resource Leveling. Journal of Industrial Engineering and Engineering Management, 2004,Vol.18 No.1,52-56.

[18] Zhang Lianying, Wang Liang, Lv Wenxue Calculation and Analysis of Project Network Based on Fuzzy Set. Journal of Tianjin University, 2004,Vol.37 No.2,175-178.

[19] Fuzzy Comprehensive Optimization Of Construction Time-Cost Trade-Off. China Civil Engineering Journal, 2003,Vol.36 No.3,46-50.

[20] Zhang Lianying, Zhang Jie ,Yang Xiang. Fuzzy Evaluation Method In Contractor Prequalification. China Civil Engineering Journal, 2003,Vol.36 No.9,1-7.

[21] Zhang Lianying, Luo Gang. Genetic Algorithms In Resource Optimization Of Construction Project. Journal of Tianjin University, 2001,Vol.34,No.2.

【Honors and Awards】

[1] 1999 Hua Wei’s scholarship for faculty in Tianjin University

[2] 1998 Prize for Science and Technology Progress awarded by SINOPEC

Projects

【Academic Research Projects】

[1] Research on risk-sharing mechanisms and theory model based on the delivery model of IPD project, belonging to the National Natural Science Foundation of China projects, No. 71272146 2013.1-2012.12.

[2] The multi-objective optimization research of project based on the algorithm of genetic immune particle swarm, belonging to the National Natural Science Foundation of China projects, No. 70871088 2009.1--2011.12

[3] Research on the standard of consulting engineering terminology,

[4] Research on the system of standard of consulting engineering, belonging to China Association of Equipment Supervision,2007-2009

[5] Research on the development plan of logistics and service industry in urban and rural areas in Hengshui, city of Hengshui, 2005-2007

【Company Cooperative Projects】

[1] Integrated transaction management mode and application research of Expressway based on lean construction, Tianjin Saiying Engineering Building Advisory Management Limited, 2011.9-2016.12

[2] EPC Project Risk Management Research, Glodon Software Co., Ltd., 2010.6-2012.12

[3] Company Development Strategy Research of The Yuansiong Group. The Yuansiong Group, 2004.12-2006.6

Academic & social Service

【Academic Part-time jobs】

[1] Deputy leader of Collaborative Group of Nation Master of Engineering Project

Management Engineering

[2] Member of editorial board of Journal of Technology of Project Management,

Journal of Equipment Supervision, etc.